Project Overview

The facility will be designed to have a maximum forming capacity of 4000 metric tonnes per day. H.J. Baker will design environmental controls to ensure the plant meets all Alberta regulations and standards.

If approved, the Project would be:

  • Located about 15 kilometres southeast of the Village of Anzac on Highway 881.
  • Provincial land lease approximately 25 hectares in size.
  • The Project is expected to employ over 50 people during the 1 year construction period and create 24 jobs to operate the facility over the 30+ year lifetime of the facility.
  • Approximately $60 Million CAD will be invested in the planning, construction, and operation of the Project.